Wait for it…wait for it…merge… NOW!
Sometimes I just have to shake my head. And take a picture.

This bike lane on US 17/92 in Seminole County, just north of the Orange County line, is correctly placed between the right-most through lane and the long merge lane.
(This Google Map shot was taken before the road was rebuilt, so you won’t see the bike lane there, but shows the wider context; it runs from the Maitland Blvd. interchange to the Spartan Drive intersection; about 900 feet).
But the traffic engineers seem to think motorists should only merge during this very short dashed line section.
Not to worry. The motorists seem to be smarter than that and pass/merge where it makes sense for them.
Posted in Bikeways, Safety